Our Bathroom Process

Step 1: Design Consultation in your home The Design Consultation is the first step in the process. Contact us to set up your complimentary Design Consultation. This consultation generally lasts about an hour and provides an opportunity for your Designer to get a sense for your feelings about your current bathroom, your desires for your New bathroom, and what features you would like incorporated into your design.

What to Expect:We will discuss your design ideas and make preliminary fixture and material choices as well as other selections.

We will also discuss and help you establish a budget.

Step 2: Measurement and layout
We will measure and perform a site inspection of your space to ensure precise fit and finish of the final product. There is a nominal fee for this visit which will be credited towards the purchase price of your project.

Step 3: Finalizing the Bathroom design

  • Finalize plumbing fixture design, style, finishes and installation services to be provided.
  • Receive a detailed proposal including materials and installation services.
  • Approve the final design.
  • Sign proposal and provide deposit (standard deposit is cost of ordered fixtures with typical progress payments at installation start.

Sample Bathroom Remodeling Schedule:

  • 1. Materials ordered (Cabinets are made to order and take approximately 4 to 5 weeks, Tile and plumbing components).
  • 2. Apply for permits (if required).
  • 3. Materials delivered and inspected. Remove existing Bathroom and make any changes as specified in contract. Rough-in of plumbing and electrical and municipal inspections (if required).
  • 4. Replace or repair any drywall affected by construction.
  • 5. Install cabinetry.
  • 6. Install any new tile work.
  • 7. Install plumbing and electrical.
  • 8. Install hardware and trim.
  • 9. Final cleaning and polish.

 

What's next? Enjoy your New bathroom!!! Call us Today for Your in Home Meeting